Begindatum:
1 dec 2026Einddatum:
1 dec 2028Publicatiedatum:
15 sept 2026Purpose, core activities and scope of the assignment
The purpose of the assignment is to manage and coordinate the Onshore Base in Eemshaven for the Nordlicht cluster offshore windfarm under construction. The Onshore Base supports the Construction Management package with interim maintenance and comprises the Construction Management's onshore logistics, warehousing and operational support activities at the harbour. The Onshore Base Manager (OBM) shall coordinate onshore-base logistics, material handling and operational readiness for offshore scopes executed from a Construction Service Operation Vessel (CSOV) and Crew Transfer Vessels (CTVs).
Core activities include:
Desired end results, intermediate results and deadlines (SMART where possible)
Vattenfall AB
Optie tot verlenging: Niets over bekend.
Hybride: Geen verdere informatie
Fee: De administratieve partner rekent een aanvullende fee van € 2,50 boven op het tarief.
Overig algemeen:
Indien gelijkwaardige beloning van toepassing is op de inzet, verwijzen wij naar de onderstaande caos en de bijbehorende functieschaal die op deze rol van toepassing is. Leveranciers dienen hier bij het bepalen van het tarief vooraf rekening mee te houden. Tariefsaanpassingen achteraf op basis van deze cao-bepalingen worden niet geaccepteerd.
PLb cao: Cao Productie- en Leveringsbedrijven PLB - FNV
Vattenfall bedrijfs-cao: Bedrijfs-cao Vattenfall 2025-2026